Questions and Answers

What are the conditions of quality installation?

It's no secret that even the most beautiful and quality window with his improper installation may lose all of its original dignity: from the assembly through the joints begins, decrease the air temperature in a room on the glazing and otkosah a condensation and mold.

It was immediately pointed out that it was the installation of windows committed the most errors. And since this process is rather cumbersome, many unscrupulous companies raised a great temptation «shalturit». The buyer also saves on sound installation of windows a few pennies in the near future will be forced to part with larger sums.

Technology erection of the company AngryPlastic worked out in accordance with European standards and professionalism and gained more than 6 years experience of our professionals allows guarantee the quality and timeliness of work!

The success of the erection of the company AngryPlastic are the following:

  1. Re finished product at cootvetstvie window gap before installing the structures.
  2. Full line of action under the technical guidance developed by the German concern REHAU AG.
  3. The use of only original parts.
  4. The selection of fasteners and their correct placement in the opening phase of design.
  5. Rigid fixation of the window in the opening.
  6. Filling cavities gap insulating material that are individually selected for each structure.
  7. Restoring slopes with the obligatory warming.

Compliance with these actions in the future to avoid such troubles as of freezing windows and interior slopes, and as a consequence zapotevanie insulating glass unit and condensation, mold and mold, structural deformation and grabbing the individual elements of locking-opening.

The overall scheme of the installation of window designs

When installing window construction workers perform the following steps:

  1. Check the availability of all products ordered by the buyer, as well as the necessary tools and materials for literacy mounting.
  2. Checks the size of the finished product to match window gap to prevent a mismatch windows gap after dismantling.
  3. Prepare a job - spread on the floor of a film intended for the collection of construction debris and cover the heating radiators.
  4. Read with loops of old leaf and gently dismantle the frame of the gap.
  5. Absolve IGU of the new window and hinged stvorok (remains one frame).
  6. Prepare frame for installation in the window.
  7. Establish and strengthen in the opening frame, aligns its otvesu vertical and horizontal level.
  8. Reinforce the frame with the help of fastening elements (samorezov, lewis or plates).
  9. Returns leaf and glazing in the frame, collect the product.
  10. Govern the fixture.
  11. Providing sealing joints between the window and a wall with the help of a professional circuit foam.
  12. Set DRIP and exterior window sill.
  13. Patch outside mounting seams and restore internal otkosy using insulation.
  14. Lease installation work, demonstrate the operation of all elements of the finished design.
  15. Collect garbage bags and bring to the stairway.

Not satisfied with the answer?
Call any of the sales company and receive a comprehensive response!

Contents

Contact

Telephone in Moscow:
(multi)
(495) 648-68-68
Address:
m. Theater,
st. Nikolskaya, 15
receiving calls:
Office hours:
09:00 - 22:00 (always)
10:00 - 18:00 (weekdays)
ICQ-consultation:
Alexander 373-696-966
All rights reserved
Copyright © 2001-2007
CJSC «AngryPlastic»
Home Sitemap Contact us

, , and the most popular website in year 2009 after angryplastic.net is ,